This document identifies the important aspects of building design and construction to enable installation of solar photovoltaic and heating systems at some time after the building is constructed.
The first step in the design of a photovoltaic system is determining if the site you are considering has good solar potential. Some questions you should ask are: Is the installation site free from shading by nearby trees, buildings or other obstructions? Can the PV system be oriented for good performance?
Who is required to install a solar PV system?
All installation work must be performed by accredited CEC installers and documentation proving such accreditation must be submitted to the University. Electrical design of the system must be completed and signed off by an accredited solar PV designer accredited with the CEC.
What are the certification requirements for solar PV modules?
The PV modules shall conform to the following standards:IS 14286: Crystalline silicon terrestrial photovoltai determine the resistance of PV Modules to Ammonia (NH3)The PV module should have IS14286 qualification certification for solar PV modules (Crystalline silicon terrestrial photovoltaic
What are the requirements for a solar array mounting system?
The solar array mounting system and connection must be provided with a minimum manufacturing warranty of 10 years. The system must comply with AS/NZS 5033 and Clean Energy Council Installation guidelines.
What are the specifications for a PV module?
r the specifications for the PV Module is detailed below:The PV modules must be PID compliant, salt, mist & ammonia resistant and shoul withstand weather conditions for the project life cycle.The back sheet of PV module shall be minimum of three layers with outer laye
What is the minimum array area requirement for a solar PV inverter?
Although the RERH specification does not set a minimum array area requirement, builders should minimally specify an area of 50 square feet in order to operate the smallest grid-tied solar PV inverters on the market.